In Lean manufacturing, eliminating waste is paramount, and prolonged equipment setups often represent a significant inefficiency. SMED - Single-Minute Exchange of Die - addresses this by reducing changeover times to under ten minutes, ideally into the "single-minute" range. Developed by Shigeo Shingo for Toyota, SMED optimizes production uptime. This article explores when to apply SMED, how to implement it, and its resulting benefits.
When to Apply SMED
SMED is most effective in scenarios involving frequent changeovers, such as switching tools, dies, or product variants. It suits batch production environments - like automotive component manufacturing, packaging operations, or printing facilities - where extended setups disrupt workflow, increase inventory, or delay customer deliveries. It is particularly valuable in Just-In-Time (JIT) systems requiring flexibility and reduced batch sizes. However, SMED offers limited value in continuous production with infrequent changeovers, where setup time is rarely a constraint.
How to Implement SMED
Implementing SMED follows a systematic process:
Analyze the Current Process: Observe and document a complete changeover, timing each step - from halting the equipment to resuming production. Categorize tasks as internal (performed with the machine stopped) or external (completed while it operates).
Reallocate Tasks: Convert internal tasks, such as material staging or tool preparation, into external ones to minimize downtime.
Streamline Internal Activities: Simplify remaining internal tasks by adopting quick-release mechanisms, standardized fixtures, or precise settings to reduce adjustment time.
Enhance External Preparation: Standardize external tasks with procedures, checklists, or pre-assembled kits to ensure readiness before the machine stops.
Test and Refine: Execute the revised process, measure the duration, and incorporate operator feedback to fine-tune the approach.
Benefits of SMED
SMED yields substantial improvements. For instance, a packaging operation reduced changeover time from 40 minutes to 9, increasing capacity without additional investment. Smaller batch sizes decrease inventory costs, standardized procedures enhance quality by reducing errors, and faster setups improve responsiveness to customer demand. These gains align with Lean’s core principles of efficiency and waste reduction.
Practical Example
Pre-SMED: A mold changeover requires 50 minutes, split between preparation and adjustments.
Post-SMED: Preparation occurs externally, and adjustments use rapid-fit tools, cutting the time to 7 minutes.
Why SMED Endures
SMED’s strength lies in its structured methodology and reliance on team involvement. Begin with a single process, engage operators for their expertise, and measure progress diligently. Formalize the improved method with clear documentation and training to ensure consistency.
In Lean systems, where time directly impacts profitability, SMED provides a disciplined approach to reclaiming lost productivity. To begin, select a process with evident setup delays and apply this framework to drive measurable improvement.